If you are buying materials for a site in Nigeria, the risk is that what arrives is not what you were quoted. Our supply orders work the way our installation jobs do: the material, size, grade and quantity go into the quotation, and we supply to it.

What we supply

FRP/GRP products

FRP stands for fibre-reinforced plastic and GRP for glass-reinforced plastic.

  • Sectional tank panels: SMC (sheet moulding compound) GRP, 2m × 2m and 1m × 1m, with food-grade resin, the kind used for drinking water, on every tank. Panels are made by established manufacturers in China, South Korea and Malaysia.
  • Hardware and accessories: grade 304 or 316 stainless steel bolts and flanges; ballcock assembly, overflow, outlet valve, inlet, vent, manhole cover and ladder.
  • Fabricated parts: chemical storage tanks and components such as nozzles, elbows and manways.
  • GRP pipes and fittings.

Steel

  • Structural sections: beams, channels, angles and hollow sections.
  • Reinforcement: rebar and mesh for concrete.
  • Sheets and plates.

Specialist industrial materials

Construction materials, industrial equipment, tools and machinery, safety equipment, and electrical and plumbing supplies. The materials we install can also be ordered supply-only: epoxy flooring materials, ACP cladding panels in 3mm, 4mm and 6mm, and waterproofing membranes and coatings.

How an order runs

  1. Quotation. You send the material, size, grade and quantity, or your drawings; the quotation states each item’s grade and size.
  2. Sourcing. We buy the order to that specification.
  3. Import and clearing. Where goods are imported, FortevaWorks clears them at port, and the duty and clearing are in the quotation.
  4. Delivery. We arrange the haulage to any state in Nigeria, and our crew offloads at your site.
  5. Handover. Your representative and our supervisor check the delivery against the quotation and sign the delivery note. The delivery note and an itemised packing list are the papers a procurement manager files as evidence for the purchase.

The timeline for your order is set in the quotation; supplier availability and the distance to your site are what move it.

What decides the cost

  • The size and complexity of the order.
  • The materials and products you need.
  • Supplier availability for those materials.
  • Import, duty and clearing, where goods come from abroad.
  • Delivery, and how far and how easily your site can be reached.

Questions to put to any supplier

  1. Is the material, size and grade written in the quotation?
  2. Can I see a sample before I sign?
  3. Who clears the goods at port, and are duty and clearing in the price?
  4. Who offloads at site, and who signs off the delivery?
  5. Who answers if a defect shows up, and under whose warranty?

Who it is for

  • Oil and gas facilities: chemical tanks and components, steel, safety equipment and tools.
  • Main contractors: waterproofing and epoxy materials, steel, safety equipment and tools for their own sites.
  • Estates, developers, factories, hotels and hospitals buying FRP/GRP tank panels and accessories, and government agencies that need a quotation and specification they can file.

What to send us for a quotation

  • The material, size, grade and quantity you need, or your drawings.
  • The delivery address and state.
  • Whether you need supply only, or supply and installation.

Send these through the enquiry form.

Products we supply and install

What every job includes

The same on every supply order: a free site inspection, the specification in writing, and updates as it goes.

  1. Free site inspection and quotation

    We inspect the site free of charge, then send you a quotation.

    You receiveA detailed quotation, plus a technical drawing if you want one

  2. Materials to specification

    We supply the materials named in your quotation, to the specification written there.

    You receiveThe specification, in writing, in your quotation

  3. Milestone updates

    Photos and video by email at each stage, so you can follow the work without visiting the site.

    You receivePhotos and video by email at each stage

Related

Questions buyers ask

Can I check a sample before I order?

Yes, for FRP/GRP tank panels: sample panels are available during the bid, so you can compare the panels that arrive against the one you approved.

Do you take small orders?

Yes. There is no minimum order.

Can I order epoxy, ACP or waterproofing materials without installation?

Yes. The materials we install can also be ordered supply-only.

Is there a warranty on a supply order?

A supply-only order carries the manufacturer's warranty on the material. Our own maintenance and defect-repair periods apply to work we install.

Tell us about your site

Send the service, the site location and its size. We reply within the hour, and book your free site inspection. A detailed quotation follows, with a technical drawing if you want one.

Or call +234 8028347545.

Send an enquiry

We reply within the hour.